About the Project
The M165 Asset Condition Refurbishment Project will refurbish approximately 4.8 miles of 115kV overhead transmission lines and poles originally constructed in 1958. The Project will occur in an existing transmission line right-of-way, traversing Millbury and Worcester, Massachusetts. National Grid will be investing over eight million dollars into this refurbishment.
Project Benefit:
- Strengthen the region’s electrical transmission system
- Improve reliability and stability in the region