Construction Schedule
2023
We're excited to share the following information with you regarding pending road restoration on East Rockaway Road.
- Monday, November 13 - Thursday, November 16: Milling and Paving of East Rockaway Road between Hewlett Lane and Waverly Avenue (6:00 pm - 2:00 am)
Road restoration is a two-step process. Accordingly, contractors must first mill the street surface before applying and rolling out the new asphalt. As a reminder, East Rockaway Road will be closed during work hours. Please note that this schedule is dependent on weather and time constraints.
If you have any additional questions or concerns, as always, feel free to reach out by emailing us at box.longisland@nationalgrid.com, or by calling our project outreach team at (516) 283-5270.
Last week our crews completed commissioning activities to put the new infrastructure in service.
*The week of 10/30 neighbors can expect to see:
- Backfill and temporary restoration in advance of final restoration
- Please note, our crews will be working daytime hours this week
Traffic Management Updates:
- East Rockaway Road will have alternating one way traffic during daytime working hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued commissioning activities and resumed preparations to put the new infrastructure in service.
*The week of 10/23 neighbors can expect to see:
- Continued work to connect the newly installed infrastructure into our system
- Retiring of the existing main
Traffic Management Updates:
- East Rockaway Road will be closed from Hewlett Lane to Union Avenue while working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews prepared for commissioning activities for the new infrastructure.
*The week of 10/9 neighbors can expect to see:
- Continued preparation to put the new infrastructure in service
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours when working on Waverly Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews prepared for commissioning activities for the new infrastructure.
*The week of 10/2 neighbors can expect to see:
- Continued preparation to put the new infrastructure in service
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued backfilling between Pleasant Place and Waverly Avenue and continued commissioning activities for the new infrastructure on Waverly Avenue.
*The week of 9/18 neighbors can expect to see:
- Backfill and temporary restoration on East Rockaway Road
- Continued preparation to put the new infrastructure in service
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued backfilling between Pleasant Place and Waverly Avenue.
*The week of 9/11 neighbors can expect to see:
- Backfill and temporary restoration on East Rockaway Road between Channon Court and Waverly Avenue
- On September 11 and 12, there will be daytime work hours for commissioning activities on the new infrastructure in addition to our regularly scheduled evening work hours
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued commissioning activities on the newly installed infrastructure and resumed backfilling working westbound from Waverly Avenue.
Please note our crews are off Sunday 9/3 and Monday 9/4.
*The week of 9/4 neighbors can expect to see:
- Backfill and temporary restoration on East Rockaway Road continuing westbound
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews completed pipe installation and prepared for commissioning activities on the newly installed infrastructure.
*The week of 8/28 neighbors can expect to see:
- Backfill and temporary restoration on East Rockaway Road starting at Waverly Avenue and heading westbound
- Safety assurance testing involving crew presence on Waverly Avenue and on East Rockaway Road near Union Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued main installation on Waverly Avenue and East Rockaway Avenue and excavation west of Union Avenue in advance of commissioning activities.
*The week of 8/21 neighbors can expect to see:
- Main installation on East Rockaway Road and Waverly Avenue
- Main installation on East Rockaway Road west of Union Avenue
- Preparation for infrastructure commissioning activities near Union Avenue and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued main installation on East Rockaway Road between Channon Road and Waverly Avenue and excavation on Waverly Avenue between East Rockaway Road and East Voss Avenue.
*The week of 8/14 neighbors can expect to see:
- Main installation on East Rockaway Road and Waverly Avenue
- Re-excavation of the tie-in pit located on the North side of East Rockaway Road west of Union Avenue
- Excavate trench and install main across East Rockaway Road at the tie-in location west of Union Avenue
- Preparation for infrastructure commissioning activities
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Waverly Avenue will be closed from East Rockaway Avenue to East Voss Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued main installation on East Rockaway Road in the Union Avenue intersection and excavation on East Rockaway Road between Channon Road and Waverly Avenue.
*The week of 8/7 neighbors can expect to see:
- Main installation on East Rockaway Road between Waring Court and Waverly Avenue
- Excavation and main installation in the East Rockaway Road - Waverly Avenue intersection
- On Saturday 8/12, there will be daytime work on Waverly Avenue between East Rockaway Road and Willard Drive
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be a change in traffic pattern on Waverly Avenue near our work zone.
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
Last week our crews continued main installation and temporary restoration on East Rockaway Road in the Union Avenue intersection and excavation on East Rockaway Road between Channon Road and Waverly Avenue.
*The week of 7/24 neighbors can expect to see:
- Main installation and temporary restoration on East Rockaway Road between Union Avenue and Hewlett Lane
- Main installation on East Rockaway Road between Channon Road and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued main installation and temporary restoration on East Rockaway Road in the Union Avenue intersection and excavation on East Rockaway Road between Channon Road and Waverly Avenue.
*The week of 7/17 neighbors can expect to see:
- Main installation and temporary restoration on East Rockaway Road between Auerbach Avenue and Hewlett Lane
- Excavation and main installation on East Rockaway Road between Channon Road and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued main installation and temporary restoration on East Rockaway Road near Union Avenue and excavation on East Rockaway Road between Channon Road and Waverly Avenue.
*The week of 7/10 neighbors can expect to see:
- Main installation and temporary restoration on East Rockaway Road between Auerbach Avenue and Hewlett Lane
- Excavation and main installation on East Rockaway Road between Channon Road and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued main installation on East Rockaway Road west of Union Avenue and excavation on East Rockaway Road between Channon Road and Waverly Avenue.
Please note our crews will not be working Monday, July 3 or Tuesday, July 4.
*The week of 7/3 neighbors can expect to see:
- Main installation on East Rockaway Road between Auerbach Avenue and Hewlett Lane
- Excavation and main installation on East Rockaway Road between Channon Road and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued main installation on East Rockaway Road west of Union Avenue and excavation on East Rockaway Road between Channon Road and Waverly Avenue.
*The week of 6/26 neighbors can expect to see:
- Main installation and temporary restoration on East Rockaway Road between Auerbach Avenue and Hewlett Lane
- Excavation and main installation on East Rockaway Road between Channon Road and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued work on East Rockaway Road west of Union Avenue and continued backfill and temporary restoration between Huckleberry Lane and Union Avenue.
*The week of 6/19 neighbors can expect to see:
- Main installation and temporary restoration on East Rockaway Road between Auerbach Avenue and Hewlett Lane
- Excavation and main installation on East Rockaway Road between Channon Road and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued excavation on East Rockaway Road west of Union Avenue and continued backfill and temporary restoration. Please note as of June 11, our crews will be working Sunday nights in addition to our current Monday to Friday schedule.
*The week of 6/12 neighbors can expect to see:
- Main installation on East Rockaway Road between Auerbach Avenue and Hewlett Lane
- Excavation on East Rockaway Road between Cynthia Court and Waverly Avenue
- Continued backfill and temporary restoration on East Rockaway Road
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued gas main installation on East Rockaway Road west toward Union Avenue and continued backfill and temporary restoration. Please note there will be no work on Monday, May 29.
*The week of 5/29 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road between Hunt Drive and Hewlett Lane
- Continued backfill and temporary restoration on East Rockaway Road
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- There will be lane closures on East Rockaway Road between Union Avenue and Hewlett Lane when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued gas main installation on East Rockaway Road west of Huckleberry Lane and continued backfill and temporary restoration.
*The week of 5/22 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road between Hunt Drive and Union Avenue
- Continued backfill and temporary restoration on East Rockaway Road
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued gas main installation on East Rockaway Road west of Hilary Court and completed the excavation on Waverly Avenue.
*The week of 5/15 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road between Huckleberry Lane and Union Avenue
- Continued backfill and temporary restoration on East Rockaway Road
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued gas main installation on East Rockaway Road between Hillary Court and Huckleberry Lane
*The week of 5/8 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road west of Hillary Court
- Excavation on Waverly Avenue between East Rockaway Road and Willard Drive
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Changes in traffic pattern on East Rockaway Road between Hewlett Lane and Union Avenue when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued gas main installation on East Rockaway Road between Pleasant Place and Hillary Court.
*The week of 5/1 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road working westbound from Hillary Court
- Backfill excavation on East Rockaway Road near the Union Avenue intersection
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Changes in traffic pattern on East Rockaway Road between Hewlett Lane and Union Avenue when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued gas main installation on East Rockaway Road between Pleasant Place and Hillary Court.
*The week of 4/24 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road working westbound from Hillary Court
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Changes in traffic pattern on East Rockaway Road between Hewlett Lane and Union Avenue when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews continued gas main installation on East Rockaway Road between Channon Road and Pleasant Place.
*The week of 4/17 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road working westbound from Pleasant Place
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Changes in traffic pattern on East Rockaway Road between Hewlett Lane and Union Avenue when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews began gas main installation on East Rockaway Road between Channon Road and Hilary Court. Please note that as of Monday, April 10, our crews will be working Monday to Friday nights from 6:00 pm to 2:00 am for the remainder of the project.
*The week of 4/10 neighbors can expect to see:
- Continued excavation and main installation on East Rockaway Road
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Changes in traffic pattern on East Rockaway Road between Hewlett Lane and Union Avenue when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews excavated near the Union Avenue - East Rockaway Road intersection. Please note, there will not be work on Wednesday 4/5 and work on Thursday night 4/6 will begin at midnight. There will also be work the night of Friday 4/7.
*The week of 4/2 neighbors can expect to see:
- Excavation and main installation on East Rockaway Road starting at Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Changes in traffic pattern on East Rockaway Road between Hewlett Lane and Union Avenue when working west of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews excavated near the Waverly Avenue - East Rockaway Road intersection and continued mobilization of construction materials.
*The week of 3/26 neighbors can expect to see:
- Excavation near the Union Avenue and East Rockaway Road intersection
- Excavation and main installation on East Rockaway Road starting at Waverly Avenue and moving westbound.
Traffic Management Updates:
- East Rockaway Road will be closed from Stevenson Road to Union Avenue during work hours when working west of Union Avenue
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.
*Please note, due to the complexities of outdoor construction, schedule is subject to change.
Last week our crews mobilized along East Rockaway Road and began test pitting in advance of main installation.
The week of 3/19 neighbors can expect to see:
- Excavation and main installation on East Rockaway Road between starting at Waverly Avenue and moving westbound.
Traffic Management Updates:
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours
- Our crews will have flaggers present to redirect traffic as necessary
We are pleased to note that work is beginning on the Hewlett - East Rockaway Road Project. Our crews will begin mobilization of construction vehicles and equipment during daytime hours began Tuesday, March 7, and overnight work is scheduled to begin Sunday, March 12.
The week of 3/12 neighbors can expect to see:
- Continued mobilization of materials along East Rockaway Road as necessary
- Test pitting on East Rockaway Road between Hewlett Lane and Waverly Avenue
Traffic Management Updates:
- East Rockaway Road will be closed from Stevenson Road to Union Avenue during work hours when working west of Union Avenue
- East Rockaway Road will be closed from Union Avenue to Waverly Avenue during work hours when working east of Union Avenue
- Our crews will have flaggers present to redirect traffic as necessary
Please feel free to reach out to our project-specific outreach phone line 516-283-5270 or our email address box.longisland@nationalgrid.com with any questions, concerns, and comments.