Skip to main content

Styleguide

This is an excerpt from our Website Guidelines -- see full guidelines here.

This webpage lists & links to demos of the Components and styling used to build these webpages. 

This page covers: 

TypographyButtons | Call to Action link | Table | Lists | BlockquoteSlideshow | YouTube Video |

Other Demos:


Typography 

Heading One

Heading Two

Heading Three

Heading Four

Heading Five
Heading Six

Buttons

Button-Primary   Button-Secondary


Call to Action

Call to Action


Lists

Unordered List

  • If any item in a list (ordered or not) forms a complete sentence, all items must begin with a capital letter and end with a terminal punctuation mark.
  • If no items in an unordered list form a complete sentence, skip the capitalization and terminal punctuation.
  • If the items in the list complete an unfinished introductory sentence, end all but the last item with a semicolon, add an “and” before the final item, and finish off with terminal punctuation.

Ordered List

  1. Lorem ipsum dolor sit amet, vim error decore copiosae cu, mel no altera fabellas delicata, complectitur comprehensam est ex.
  2. At nam unum equidem dignissim.
  3. Autem aeque qualisque ea sea. 

Level 2 webpage.   

  • Left navigation for these Level2 pages except Outage Central is implemented via Sub-Navigaton>Asset with _Section Navigation.
  • Because Outage Central has children pages, the asset is placed in the /Outage Central folder, in order to make its breadcrumb link active on child pages.  Since it's in a sub-folder, it can't use the same _Section Navigation file as the other Level 2 webpages.  So, left navigation is implemented via Component>WSYSIG and the navigation is hard-coded. 


Blockquote

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. 

Tables

A. Regular Table

Monthly Usage Fixed Price Total
November 500 Ccf $0.10250 $51.25
December 500 Ccf $0.10250 $51.25
January 500 Ccf $0.10250 $51.25
February 500 Ccf $0.10250 $51.25
$205.00



B. Two-Column Transparent Table 

Row One: Table Cell One

sample content

Table Cell Two

sample content

Row Two: Table Cell One

sample content

Table Cell Two

sample content

 

C. Four Column Transparent Table 

One

Outdoor Lighting Upgrades

Two

Lighting Occupancy Sensors

Three

Walk-in Cooler Efficiency Measures

Four

Custom Projects

Five

Outdoor Lighting Upgrades

Six

Lighting Occupancy Sensors

Seven

Walk-in Cooler Efficiency Measures

Eight

Custom Projects